Your servers belong
in the cloud.
The move doesn't have to hurt.
Zero-downtime migration to Azure, AWS, or Microsoft 365. Fixed-price projects with rollback guarantee. From assessment to optimisation — we handle the entire journey.
Capabilities
Every platform.
Every workload.
Azure & Microsoft 365
Full Azure landing zone deployment. Microsoft 365 tenant migration, Exchange Online, SharePoint, and Teams. Entra ID integration and conditional access.
AWS Migration
EC2, RDS, S3, Lambda — we architect and migrate across the full AWS stack. Well-Architected Framework reviews and multi-account strategy included.
Hybrid Cloud
Not everything belongs in public cloud. We design hybrid architectures with Azure Arc, AWS Outposts, or on-prem integration for compliance-sensitive workloads.
Data Migration
Database migration with zero data loss. SQL Server, PostgreSQL, MySQL, Oracle — replatformed or refactored. Automated validation and rollback testing.
Application Modernisation
Lift-and-shift is just the start. We refactor legacy apps into containers, serverless, or microservices. Kubernetes orchestration and CI/CD pipelines.
Cost Optimisation
FinOps practices from day one. Right-sizing, reserved instances, spot workloads, and automated scheduling. Typical savings: 25–40% on monthly cloud spend.
Packages
Clear pricing.
No surprises.
Assessment & Strategy
$4,999
one-off
Comprehensive cloud readiness assessment. Infrastructure audit, dependency mapping, cost modelling, and a prioritised migration roadmap tailored to your environment.
Standard Migration
From $9,999
End-to-end migration of your workloads to Azure or AWS. Includes planning, execution, testing, and a 30-day hypercare period post-cutover.
Enterprise Migration
Custom
Large-scale, multi-phase migration for complex environments. Hybrid cloud architecture, application modernisation, and dedicated project management.
Managed Cloud
$999/mo
Ongoing cloud management, optimisation, and support. Cost governance, security patching, performance monitoring, and monthly reporting.
Process
From on-prem to cloud in weeks.
Cloud Readiness Assessment
Full infrastructure audit, application dependency mapping, security review, and TCO analysis. You get a scored readiness report and prioritised migration plan.
Architecture & Planning
Landing zone design, network topology, identity integration, and governance framework. Every workload gets a migration strategy — rehost, replatform, or refactor.
Migration Execution
Phased migration with automated tooling. Zero-downtime cutovers, parallel running, data validation, and user acceptance testing at each stage.
Optimisation & Handover
Cost right-sizing, performance tuning, documentation, and team training. 30-day hypercare with dedicated support before full handover.
Why Us
Migration without the migraine.
Guaranteed.
Zero-Downtime
Parallel running, blue-green cutovers, and DNS failover. Your users never notice the migration happened. Guaranteed.
Australian Data Residency
All data stays in Australian regions. Azure Australia East/Southeast, AWS ap-southeast-2. Sovereignty requirements met.
Platform Agnostic
Azure, AWS, Google Cloud, or multi-cloud — we recommend what fits your workload, not what earns us commission.
Fixed-Price Projects
No blow-outs. Assessment and standard migrations are quoted upfront. You know the cost before we start.
Rollback Guarantee
Every migration includes a tested rollback plan. If something goes wrong mid-cutover, we revert in minutes — not days.
Post-Migration Support
30-day hypercare included. Dedicated engineer on standby for issues. Optional ongoing managed cloud services after handover.
Coverage
Cloud migration services
across Australia.

Sydney
CBD, North Shore, Western Sydney, Eastern Suburbs, Parramatta

Melbourne
CBD, Southbank, St Kilda, Richmond, Docklands

Brisbane
CBD, Fortitude Valley, South Bank, Gold Coast, Sunshine Coast

Perth
CBD, Subiaco, Fremantle, Joondalup, Rockingham

Adelaide
CBD, North Adelaide, Glenelg, Norwood, Prospect

Canberra
Civic, Barton, Woden, Belconnen, Tuggeranong
Remote migration services available Australia-wide — no on-site presence required for most cloud workloads.
FAQ
Common questions.
A standard migration of 5–10 workloads typically takes 6–10 weeks from assessment to cutover. Enterprise migrations with 50+ workloads run 3–6 months in phased waves. We provide a detailed timeline during the assessment phase.
No. We use parallel running, database replication, and blue-green deployment strategies to achieve zero-downtime cutovers. Users continue working normally throughout the migration — the switch happens transparently.
Absolutely. Not every workload belongs in public cloud. We design hybrid architectures using Azure Arc, AWS Outposts, or VPN/ExpressRoute connectivity for workloads that need to stay on-premises due to latency, compliance, or licensing constraints.
Every migration includes a tested rollback plan. We validate rollback procedures before each cutover window. If an issue is detected, we revert to the source environment within minutes — not hours or days.
Yes. We migrate Active Directory to Entra ID (Azure AD) with hybrid sync or full cloud-native deployment. Group policies, conditional access, and MFA are configured as part of the identity migration.
All workloads are deployed to Australian cloud regions — Azure Australia East/Southeast or AWS Sydney (ap-southeast-2). Data never leaves Australian jurisdiction. We also support government-grade sovereign cloud for classified workloads.
Still running on-prem
servers from 2015?
Free cloud readiness assessment. Fixed-price migration. Zero downtime. Rollback guarantee. Let's get you into the cloud — properly.
Vyntech Pty Ltd · Australian-Owned & Operated
Cloud Migration · Azure & AWS Partner · ABN Registered